Steam jet vacuum pump these operation and maintenance methods, remember!

Addtime: 2020-07-17 Browse times: 2265

1、 Installation:


1. The steam jet vacuum pump can be installed outdoors. In case of shutdown or in freezing weather, the whole unit can be drained quickly because the inner connecting pipe has been installed for quick drainage.


2. The water ring pump must have enough static pressure and the packing box of the pump must have water seal. A check valve is installed in the discharge pipe of the pump to prevent intermittent or pulse air backflow. In order to effectively balance the pressure difference between the condensers, there must be a suitable long circuit in the pipeline closed circuit. It is better to install a drain pipe at the lowest position of each loop pipe, which can also be used as the water outlet for cleaning the condenser.


3. When installing the steam pipe, attention must be paid to make the steam sent to the nozzle as dry as possible, and there is insulation between the steam separator and the jet pump. The shorter the steam pipe is, the better. The separator should be kept dry for a long time. Therefore, the steam pipe connected to the jet pump must be connected with warm steam from the upper end of the main steam pipe, which not only corrodes the nozzle and spreads prematurely, but also seriously affects the function of the small nozzle mouth.


Due to the requirement of high vacuum and especially the small nozzle diameter in the pump, it is necessary to check whether the air pipe installed between the steam filter and the steam nozzle in the jet pump is clean. The steam jet pump is equipped with a so-called small steam inlet box, which can easily remove the nozzle and intuitively check the nozzle path with a probe. The steam gasket should not be placed eccentrically, so as not to affect the free flow sectional area of steam.


2、 Operation:


(1) Starting sequence


1. Close all reactor shut-off valves and gate valves.


2. The steam pipe is completely blowdown and drained. The exhaust gas is discharged all the time to supply saturated steam. The blowdown valve is slightly opened.


3. Open the water ring pump, open the water valve of the supply pump, and open the stop valve in the vacuum main pipe to reach about 93 and 9 mbar.


4. Start the secondary steam jet pump, and the minimum input steam pressure before the nozzle shall not be lower than 3 or 5 bar, and the maximum steam pressure shall not be higher than 5 bar.


5. Start the first stage steam jet pump, and the steam pressure in front of the nozzle shall not be lower than 3 or 5 bar.


6. After all jet pumps are turned on, adjust the inlet valve of condenser to make its discharge water temperature not exceed 36 ℃.


(2) Shutdown sequence


1. Close the vacuum master valve.


2. Close the steam valve of the first stage jet pump.


3. Close the steam valve and main steam valve of the second stage jet pump.


4. Stop the water ring pump and close all water supply valves.


3、 Maintenance method:


1. The packing should be compacted regularly. If the required sealing cannot be guaranteed due to wear, the packing shall be replaced. The packing shall not be pressed too tightly. The normally compacted packing is allowed to leak out in drops, but the amount shall not be too much. Oil impregnated asbestos rope shall be used as filler.


2. However, the measured temperature should not be greater than 70 ℃, and 2 / 3 of the whole space in the bearing chamber should be filled with grease. The bearing in normal operation should be filled with oil 3-4 times a year, and the bearing should be cleaned at least once a year, and all lubricating oil should be replaced.